Marine Parkway Bridge

American Pile and Foundation was responsible for the construction of 192 Anchor Piles for the renovation of the Marine Parkway Bridge Fender System. The anchor piles were composed of a combination of mini pile methodologies and DCP anchors to a depth of 125 feet. The project was located in 12 different cofferdams throughout the length of both sides of the Bridge. The use of marine barges carrying a crawler crane and a drill rig was a key part in completing the project. Multiple grout plans were specifically designed in-house for the project and were used in grouting all of the DCP anchors. Over 450 pallets of cement was used at the completion of the project.