Holtec Technology Center

American Pile and Foundation LLC was awarded 3 phases of this project which included a Test Pile Program, Manufacturing Building, and Office Building. The project consisted of the installation of over 3,700 pipe piles for a manufacturing building and office building. The piles will support over 500,000 sq. ft. of fabrication, machining, and staging space served by cranes with up to 400-ton capacity. American Pile and Foundation’s work consisted of the full installation of over 3,700 16-inch diameter pipe piles of varying depths between 30 and 90 feet. This includes driving, splicing, placing concrete, and installing rebar. This was achieved through the use of multiple rigs, including Junttan PM25s and Manitowac 4000 cranes with fixed leads. APF also installed over 1,100 linear feet of permanent sheeting to retain soil for the driving of over 350 piles in the pit excavations.