National Grid-Spring Creek Phase II

American Pile and Foundation was subcontracted to furnish and install 14 Helical Piles to a minimum torque of 10,300 ft-lbs. The piles are 3.5 inch OD round pipe, installed up to 53 feet long. American Pile and Foundation also provided a compression load test.